The group company held a safety production office meeting in June 2022- summarizing June 2022 and arranging safety production for July 2022
2022-07-04
The Minister of Safety Supervision, Qu Zhong, reported on the safety work in June, including the inspection and rectification of hidden dangers, the situation of exceeding the limit of mine gas and carbon monoxide, the impact of mechanical and electrical equipment, work-related injuries, safety penalties, existing problems, major risks in the company and various mines, and the safety work ideas for the second half of the year. He also made arrangements for the key safety work in July.
Guizhou Zisenyuan Group Investment Co., Ltd
briefing
Issue 12, 2022
Hosted by: Company Party Committee, Trade Union, Office July 4, 2022
The group company held a safety production office meeting in June 2022
——Summarize June 2022 and arrange safety production for July 2022

1、 Each unit reported on the work of safety production and safety production standardization management system in June, as well as the shortcomings in the work. They raised the problems that need to be solved to the company, summarized the work in June, and planned and arranged the work in July.
2、 The Minister of Safety Supervision, Qu Zhong, reported on the safety work in June, including the inspection and rectification of hidden dangers, the situation of exceeding the limit of mine gas and carbon monoxide, the impact of mechanical and electrical equipment, work-related injuries, safety penalties, existing problems, major risks in the company and various mines, and the safety work ideas for the second half of the year. He also made arrangements for the key safety work in July.
3、 Chen Lijun, the Minister of the Department of Mechanical and Electrical Engineering, made arrangements for the transportation of mechanical and electrical equipment.
4、 Qu Jiabi, Deputy General Manager of Safety, organized a study on the cases and punishment notices of individual coal mines in Guizhou Province for violations and illegal activities, and required all mines to carefully organize the study and learn from the experience and lessons. The following work requirements have been proposed: 1. The first half of the year has ended, and the number of work-related injuries exceeded expectations. All units should carefully sort and summarize. 2. Gas management is of utmost importance, and sufficient air intake must be ensured at the mining face. 3. On site support should be in place to strengthen the management of the roof. 4. The air volume sensor on the mining surface should be installed completely to ensure normal use; The installation of the belt conveyor and carbon monoxide monitoring device should be in place, and the methane sensor should be installed according to the requirements. 5. Strengthen the management of monitoring and surveillance systems. 6. To further strengthen the management of work-related injuries, the company has established a WeChat group for work-related injury management. All units should report work-related injuries in a timely manner. Failure to report in a timely manner will result in a fine of 500 yuan per incident for the safety manager.
5、 Deputy General Manager of Tongfang, Bao Jiming, has made the following work arrangements: 1. Strengthen gas management and enhance the management of gas pumps and main fans. 2. Chaoyang Coal Industry and Guixin Coal Mine should strengthen power supply work to prevent gas exceeding the limit. 3. Take the drilling site seriously and strengthen gas drainage. 4. In July, the company conducted a special inspection of the extraction system. 5. According to company documents, each mine is required to prepare a three-year, five-year, and ten-year gas control plan before August 15th, submit it to the company, and the communication and prevention department will track and implement it.
6、 Chief Engineer Zhu Zengxiao has made the following work arrangements: 1. According to the requirements of the document, we will effectively strengthen gas control, and in accordance with the company's arrangements, each mine will conscientiously implement it. 2. Gas control requires the preparation of three-year, five-year, and ten-year plans. 3. Carry out water prevention and control measures during the rainy season, control and drain water leakage points, and strengthen inspections of low-lying areas in mining work to prevent flooding. 4. Strengthen the quality standardization management of the main tunnels, and maintain the necessary calibration of the waistline. The production department and safety supervision department should supervise the implementation. 5. The implementation of regulatory measures must be in place, and relevant departments should supervise their implementation. 6. The construction of air doors and enclosed facilities must be carried out in accordance with the requirements. 7. The ambulance team should promptly rectify the problems identified by the superiors and complete them by July August. 8. Control material supply to ensure the normal construction needs of Guixin Coal Mine and Chaoyang Coal Industry, strengthen the management of measurement data, and ensure the accuracy of measurement points. 9. Make a backup of the submitted materials for easy retrieval and inspection by superiors. 10. Each mine shall design and report according to the company's comprehensive mining face design template.
7、 Executive Vice General Manager Shi Minghua reported on the completion status of production tasks in June. The following arrangements are made for the work: 1. Chaoyang Coal Industry and Guixin Coal Mine have not yet obtained their certificates. The two coal mines need to carefully consider what work should be done? What job can I do? We must grasp various control measures and strictly investigate the shortage of positions and personnel in important positions. Guixin Coal Mine needs to have a clear understanding of how to open and close, and try to use equipment from the same manufacturer for the six major systems to facilitate later maintenance. Chaoyang Coal Industry must ensure that gas cannot exceed the limit. 2. Honghui Coal Mine needs to do a good job in the installation of the 20300 mining face in the second mining area and coordinate the replacement of the main inclined shaft belt. 3. Zhongheng Coal Mine: Strengthen the management of the roof of the 12003 mining face, strengthen the management of the 115-101 cutting hole, accelerate the repair of the coal bunker, ensure the distribution and transportation of goods, and improve the washing efficiency. 4. Yangchangpo Well Area: Strengthen safety work during the installation of the comprehensive mining face, pay attention to the installation progress, and ensure the implementation of regulations and measures. 5. Mangyuan Coal Mine: Key procedures and approvals for joint trial operation; Carry out the construction of the 302 bottom extraction roadway.
8、 The director of the management office, Chen Hua, proposed the following work priorities: 1. The personnel position allocation of Chaoyang Coal Industry shall be implemented in accordance with the company's issued documents. 2. The standardization of safety production in all units, whether on the ground or underground, should be done well to prevent low efficiency and repeated investment. 3. Guixin Coal Mine needs to clarify its thinking and work objectives, and all procedures must be complete and complete to ensure legality. 4. Regarding contract management, the company will introduce a contract management system, which will be issued in July. Implement hierarchical management, gradually standardize, and strictly implement the documents issued by each unit.
9、 Peng Xianglai, the Chief Financial Officer and Minister of Human Resources, has put forward the following requirements: 1. The personnel allocation of Chaoyang Coal Industry shall be implemented in accordance with the company's approved documents, and they shall do their work well according to their responsibilities. 2. Strengthen coordination and communication to ensure production. Zhongheng Coal Mine and Honghui Coal Mine will try to transition to normal production as much as possible to ensure income and efficiency. 3. Strengthen the management of the team. With the transformation and upgrading of intelligence and mechanization, the quality of personnel cannot keep up, and they need to have a sense of crisis and urgency. Strengthen learning, adapt to new knowledge needs, and meet the requirements of job development. 4. Each unit should evaluate newly recruited management personnel fairly and reasonably, and strengthen management.
10、 Li Qunduo, Secretary of the Party Committee and Chairman of the Trade Union, put forward the following requirements: 1. On June 20th, Liupanshui City issued a document on the reward measures for safety production reports, which includes eleven aspects. Each unit should combine the content of the measures, do detailed work, and handle affairs in accordance with laws and regulations. Strengthen the management of professional technical personnel and enhance confidentiality. 2. Firmly establish safety awareness, ensure safe production, implement the responsibility system, and ensure that each level is responsible for each level. 3. Strengthen the training and education of employees' safety awareness, and implement the rectification of safety hazards. 4. The statistics of work-related injuries shall be carried out according to the arrangement of Qu Jiabi, the Deputy General Manager of Safety, in order to restore the previous statistical methods. 5. Strengthening the construction of spiritual civilization, the company was awarded the title of Civilized Unit in Liupanshui City in 2018. The review materials for 2020-2022 have been submitted, and all units should prepare the materials for higher-level inspections. 6. Do a good job in building the party branches of Guixin Coal Mine and Chaoyang Coal Industry. 5. Tomorrow, July 1st, the company's party committee will hold various activities, and all units will arrange party members to participate according to the requirements of the document.
11、 General Manager Li Wen proposed the following requirements: 1. All units should conscientiously implement the work arrangements of the company's leaders. 2. The work-related injury in Yangchangpo has always been the highest in the company, and we must pay close attention to safety management. The existing problems include: lax and lax management; Inadequate implementation of regulatory measures; Lack of diligence in work and inadequate performance of duties; Not fulfilling duties and responsibilities, inadequate supervision. 3. Guixin Coal Mine and Chaoyang Coal Industry need to quickly clarify the various tasks on the ground and underground, allocate various personnel as soon as possible, and use suitable personnel according to the actual work. 4. We need to recognize the current security situation. Currently, the security situation in Guizhou is not good. All units should implement and study the superior documents. 5. Seriously rectify the problems raised by the national assistance group. Those that have not been rectified must be rectified promptly and urgently. Looking back, we will conduct both overt and covert investigations, and all units should attach great importance to it. 6. The problems existing in each unit should be rectified in a timely manner without delay. 7. Seriously strengthen the work of civilized production and quality standards underground. 8. Special project: Ensure the safety of mining face installation, recycling, drilling, and passing through old alleys, assign dedicated personnel, and fulfill responsibilities. 9. Organize production seriously, exert subjective initiative, establish confidence, produce more coal, and improve efficiency.