The group company held a safety production office meeting - summarizing August 2021 and arranging safety production for September 2021
2021-09-03
Each unit reported on their safety production, quality standardization, business situation, and shortcomings in their work for August, raised issues that need to be addressed to the company, and planned and arranged their work for September.
Guizhou Zisenyuan Group Investment Co., Ltd
briefing
Issue 19, 2021
Hosted by: Company Party Committee, Trade Union, Office September 3, 2021
The group company held a safety production office meeting
——Summarize August 2021 and arrange safety production for September 2021

Each unit reported on their safety production, quality standardization, business situation, and shortcomings in their work for August, raised issues that need to be addressed to the company, and planned and arranged their work for September.
The head of the company's safety supervision department, Qu Jiabi, reported on the company's safety production inspection, safety hazard investigation, various coal mine injuries and their causes, and hidden danger inspection and punishment in August, and arranged the safety work priorities for September. He requested all units: the new Safety Production Law will officially come into effect on September 1, 2021, and they must study the content of the new Safety Production Law carefully and implement safety production work in accordance with the new Safety Production Law.
3、 Zhao Xingben, Deputy General Manager of Safety, analyzed and summarized the safety situation in August. He pointed out that the number of work-related injuries in August decreased compared to July and the same period last year. The main reason for work-related accidents was the poor awareness of self-protection and self-protection ability of employees. Among them, Zhongheng Coal Mine should attach great importance to safety management, strengthen the management of team members and enhance the safety construction of the team. The mining team is required to hold a special meeting to conduct specialized research on work-related injuries in Zhongheng Coal Mine, analyze and summarize the causes of work-related injuries, and come up with rectification plans.
He put forward the following requirements for the work in September: 1. Seriously understand General Secretary Xi Jinping's important remarks on safety production and his instructions on safety production. 2. Seriously implement the national laws and regulations on safety production and the safety instructions from superiors. 3. Understand the spirit of safety instructions issued by superiors, adapt to new regulations, requirements, and thinking on safety production at the national, provincial, municipal, and county levels. 4. We will conscientiously implement the spirit of the national security video conference on August 25th, draw lessons from the 8.14 water leakage accident at Chaidar Coal Mine in Qinghai and the 8.10 safety accident at Zhengzhu Mining in Ruitai Well Mine in Fenxi, Shanxi. In response to these two accidents, the company has issued the "Notice on Issuing the Implementation Plan for Safety Production Inspection of Coal Mines Belonging to the Company" (2021) No. 6 document, and each coal mine will carefully organize and carry out safety inspections in accordance with the documents. 5. Seriously ensure the operation of underground power supply, including internal and external power supply, and conscientiously implement the supervision of power supply. 6. Each unit should conscientiously implement safety standards, fulfill safety management responsibilities, and focus on team building. Leaders in charge of safety should have a clear understanding of safety. 7. Each coal mine manager should organize various standard reinforcement learning and training. 8. The focus of work for each coal mine in September is: (1) Zhongheng Coal Mine will focus on the installation of the 12001 mining face and the withdrawal of the inner mining face; Strengthen the inspection of power supply systems in locations with long downtime. (2) Strengthen the management of the upper and lower exits of the mining face in each mine. (3) Strengthen the backfilling work of the 1124 mining face in the Yangchangpo well area. (4) Mangyuan Coal Mine strengthens gas management for 10303 mining face excavation; Gas control lanes should prevent gas from exceeding the limit; The 1340 machine track roadway should prevent accidental coal mining. (5) Honghui Coal Mine strengthens the management of mining face and excavation. (6) Each coal mine should strengthen the self rescue of compressed air and the inspection of air ducts to prevent blockages. (7) Each coal mine conscientiously implements the management of "electronic seals" issued by the national bureau, strengthens the monitoring of dispatch, implements dedicated management, and strengthens information feedback.
4、 Bao Jiming, Deputy General Manager of Tongfang, proposed the following work arrangement: 1. Use the anti spray hole device well in Mangyuan Coal Mine, and draw while drilling. Arrange for manufacturer personnel to enter the well and conduct on-site training on the use of high-power rotary machines. 2. The foundation of the main fan in Mangyuan Coal Mine should be considered in advance and the project should be carried out as soon as possible. 3. The installation of the high concentration gas generator set in Mangyuan Coal Mine has begun. 4. Make a good prediction of the 1390 mining face area in Mangyuan Coal Mine and seize the opportunity to form the mining face. 5. After the 12001 mining face of Zhongheng Coal Mine is cut through, the air volume should be adjusted properly. Zhongheng Coal Mine also needs to do a good job in coal mining at various locations. 6. The installation of gas pumps in Honghui Coal Mine should be promptly contacted with the manufacturer and tracked and implemented. 7. Do a good job in the application of scientific and technological research projects, from application to follow-up tracking, assign a dedicated person to be responsible for each project, collect various materials, complete the data, and have corresponding rewards, punishments, and accountability measures.
5、 Chief Engineer Zhu Zengxiao has made the following work arrangements: 1. Strengthen the investigation and management of water hazards, conduct inspections once a quarter, and conduct inspections both on and off the well. Focus on preventing mining faces, excavation tunnels, and old tunnels in various coal mines. The drainage in the Yangchangpo well area should be well done, and special attention should be paid to low-lying areas. 2. Strengthen the acceptance management of engineering quality. Strengthen the management of the waistline of Zhongheng Coal Mine and the support of Honghui Coal Mine. Each coal mine should start with the team leader and acceptance personnel, prepare well before acceptance, collect and improve information, and ensure that whoever accepts is responsible. 3. Ensure the continuity of mining areas, and prepare advanced planning and construction measures. 4. The safety permit for Yangchangpojing area has been obtained, and the design of the extended development plan needs to be carried out as soon as possible.
6、 Vice General Manager of Production Shi Minghua reported on the completion of production plans for each coal mine in August and made plans for safety production in September. He put forward the following requirements: 1. Zhongheng Coal Mine should do a good job in the bottom pulling work of 115-101, strengthen the adjustment of support, and enhance the rear support; The installation of 12001 mining face shall be carried out according to the established plan, and the preparation of installation regulations shall be expedited; Strengthen the construction of the 11203 mining face transportation and return tunnels. 2. Honghui Coal Mine should prepare a budget for the installation cost of the mining face and report it in a timely manner; Carefully grasp the thickness of the coal seam in the excavation process of 11705 mining face. 3. Mangyuan Coal Mine should carry out maintenance work on individual columns; We need to increase efforts in gas control and strengthen management. 4. Strengthen the roof management of the 1124 mining face in the Yangchangpo well area; Management of the roof of the recycling shed; Strengthen the management of 1124 water and ensure dual power supply for the water pump. 5. Jinhe Coal Mine focuses on team building and organizes safety training for employees; Strengthen the management of the roof at the construction site; The reporting of the location for lane repair should be done well. 6. Due to the recent heavy rainfall, all units should pay attention to the "three prevention measures during the rainy season".
7、 Peng Xianglai, the Chief Financial Officer and Minister of Human Resources, pointed out that: 1. The recent market environment is favorable for the company's development. We should seize the opportunity, focus on production, install several mining faces, and strive to start production as soon as possible. The materials and equipment that need to be supplied should be reported in a timely manner, and the company will ensure the supply. 2. The personnel management has been basically streamlined, and social security, archives, and personnel have basically entered normal. The system ran normally in September and the basic framework has been fully improved this year. 3. The cost control system has been basically established, and potential hazards need to be eliminated and potential needs to be explored. 4. The work of all units and departments in the company should form a joint force and work together to do a good job.
8、 Zhou Xianbing, Deputy General Manager of Mechanical and Electrical Engineering, reported on the transportation situation of mechanical and electrical equipment in August and made arrangements for the work in September. He demanded that: 1. Each coal mine should accelerate the construction of dual circuits. 2. Recently, power supply problems have occurred in many areas of Guizhou Province during the rainy season, leading to gas exceeding the limit. This has attracted high attention from the country. Therefore, our company must attach great importance to the problem of gas exceeding the limit in the power supply system during the rainy season. 3. Each coal mine should strengthen the inspection of power supply lines, pay special attention to aging lines, and replace those that need to be replaced in a timely manner. 4. Strengthen equipment inspection to prevent explosions.
9、 Li Qundo, secretary of the Party Committee and chairman of the trade union, proposed: 1. Continue to strengthen the prevention and control of the COVID-19. While strengthening the education of employees, each unit should also strengthen the management of employees' outings. Employees should not leave the province unless under special circumstances to avoid further trouble. Strengthen the promotion of vaccination. 2. All management work must start from details, be solid, meticulous, and in place, strengthen responsibility, adhere to bottom line thinking, always tighten the string of safety, prevent complacency, relaxation, and blind optimism. 3. Strengthen the study of laws and regulations, improve the performance ability of management personnel, and implement the new Safety Production Law on September 1st, combining learning with application. 4. Always pay attention to on-site management to ensure safe production. Prevent safety accidents caused by complacency. Once a safety accident occurs, it can cause physical injury to employees, increase costs and bring trouble to the enterprise. 5. Strengthen the study of the Party's policies, relevant laws and regulations, as well as professional knowledge, to further enhance the ability to perform duties and work level. As a manager, we should pay attention to the combination of learning and application, use learning to promote action, and take responsibility.
Conveyed the speech of Director Huang Yuzhi. He requested that the study of General Secretary Xi Jinping's important discourse and speech on safety production be carried out seriously, and that the Ministry of Work Safety be responsible for arranging publicity and preaching activities.
He put forward the following requirements: 1. We must attach great importance to the occurrence of work-related injuries and safety hazards. Currently, there are still situations where the safety system is not fully established, safety control is not in place, the quality of employees is low, self-protection ability is weak, and the safety environment is incomplete. We must seriously rectify the opinions raised by superiors and cannot treat them passively. 2. Each mine should strengthen its own inspection work, have a clear understanding of its own problems, and actively and seriously rectify them. To fully understand the concept that management is responsibility, it is necessary to have clear measures and effective control in work. 3. Strengthen the management of the roof of the mining face in the Yangchangpo well area. Director Wu Qiansheng of the mine must strictly require and implement dual circuits for water pump pumping and power supply. 4. Tang Yuanfu, the director of Mangyuan Coal Mine, has just been transferred to the mine. He needs to grasp various information about the coal mine as soon as possible and conscientiously implement personnel responsibilities. 5. Zhongheng Coal Mine needs to strengthen the management of the upper and lower tailways of the mining face; Strengthen the management of gas, with dedicated personnel responsible for sealing and draining holes to ensure the effectiveness of gas drainage. 6. Jinhe Coal Mine should clarify the superior company and legal representative; Clarify the appointment of members of the mining team; Strictly prohibit the occurrence of engineering contracting and subcontracting issues; The safety license, mining license, safety qualification certificate and other documents must be complete. 7. Each unit shall strengthen ground environmental governance work in accordance with environmental protection requirements. And carry out safety inspections of the gatekeeper and wellhead. 8. The five positions of mine managers and management personnel in each mine should strengthen their learning and have a clear understanding of the content of inspections by higher-level departments. 9. Starting from September, a comprehensive safety inspection will be conducted on all mines, led by the company's safety supervision department and coordinated by various departments. Each department should carefully sort out the contents of the comprehensive inspection.
11、 Chairman Fan Pengfei put forward the following requirements: 1. Seize the current good market opportunities, conscientiously ensure safety production, produce more and better coal, and create good economic benefits. 2. Pay attention to gas control and do not allow gas to exceed the limit. 2. All units should make every effort to do a good job in environmental protection: focus on environmental governance, strengthen sewage treatment, and strictly prohibit external discharge. 3. Zhongheng Coal Mine will focus on all aspects of the 12001 mining face and strive to complete the installation and put it into production before October 15th. If completed on schedule, a reward of 100000 yuan will be given. General Manager Li Wen recently went to Zhongheng Coal Mine to arrange and implement the installation work of the mining face, implement the installation schedule item by item, and ensure the supply of materials and equipment. 4. Honghui Coal Mine has done a good job in all aspects of the 11708 mining face. The installation will be completed and put into production before October 10th, and a reward of 100000 yuan will be given. 5. Mangyuan Coal Mine must focus on the joint trial operation work, which must be completed by the end of September. Deputy General Manager Shi Minghua is responsible for coordinating the supply of materials and equipment, and the installation of the 1390 mining face must also be pushed forward. 6. The fully mechanized mining supports in the Yangchangpo well area will arrive gradually after mid September, and blasting operations will be carried out before arrival. 7. The ash content of Zhongheng Coal Washing Plant and Honghui Coal Washing Plant should be controlled between 10% and 10.09%, and corresponding penalties should be imposed for those below or exceeding this range. Two coal washing plants should pay special attention to environmental protection and make every effort to ensure environmental hygiene. 8. Strengthen cost control and innovate in the work of each mine. At the last team leader symposium held by the company, the team leader put forward many good suggestions, and the next step is to study and implement them. 9. For units with zero work-related injuries in the current month, rewards should be promptly fulfilled according to the documents.
Relevant Documents
Related News